How We Work

Our Renovation Process

From free consultation to final walkthrough. Edmonton interior renovations completed in 1–6 weeks.

The Process

From First Call to Final Walkthrough

Free Consultation

Everything starts with a conversation. We visit your home at a time that works for you, listen to your vision, walk through the space, and ask the right questions. There's no cost and no obligation.

Typically 60–90 minutes. We come to you anywhere in the Edmonton area.

Site Visit & Measurements

After the initial consultation, our team takes precise measurements of your space and documents existing conditions. This ensures our quote is accurate and our timeline is realistic.

Completed within 1–2 days of the initial consultation.

Design & Planning

We help you finalize material selections, including tile, flooring, cabinetry, and fixtures, then develop a detailed project plan. You'll receive a written quote with a clear scope of work and timeline.

We work around your design preferences and budget.

Demolition

Once the project is confirmed and materials are ordered, we begin with careful, controlled demolition. We protect adjacent areas of your home and remove all debris.

All demolition waste is removed from your property.

Structural Work

Framing, drywall, subfloor preparation, and any necessary rough-in work is completed at this stage. We ensure everything is level, square, and built to code before proceeding.

Inspections are coordinated where required.

Installation

This is where the transformation happens. Tile, flooring, cabinets, countertops, fixtures, and all finishing materials are installed with precision craftsmanship by our skilled team.

Progress updates provided throughout this phase.

Painting & Finishing

We complete all painting, trim work, caulking, and detail finishing. Every corner, edge, and transition is reviewed to ensure a clean, professional result.

No detail is too small; this phase defines the final look.

Final Walkthrough

We walk through the completed project together, room by room, and address any final touch-ups. You only sign off when you're completely satisfied. That's our commitment.

Typically 1–6 weeks total, depending on project scope.

Typical Timelines

How Long Will My Project Take?

Bathroom Renovation

Standard bathroom remodel from demolition to final walkthrough.

1–2 weeks

Kitchen Renovation

Full kitchen renovation including cabinets, countertops, and flooring.

2–4 weeks

Basement Development

Full unfinished basement development including framing, drywall, flooring, and finishes.

3–6 weeks